BSE Mural- Day 17

Here’s the Flat Earth map mosaic that will be installed in the front office.
Thanks to the 4th grade for finishing  the tile work, and the 5th grade for doing the grouting.

image-2

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>